Picture Source: R. Seidelmann
Central Asia
Projekat unapređenja vodoprivrede: Projektovanje programa rehabilitacije hidrometeorološke mreže
Assignment Location
Kyrgyzstan
Client/Funding
Food and Agriculture Organisation (FAO) /
The World Bank
The World Bank-financed Water Management Improvement Project (WMIP) aimed at creating the institutional, technical and regulatory conditions for sustainable and efficient water resources management in Kyrgyzstan. In this context, a reliable hydro-meteorological data collection system is essential as water allocation decisions directly depend on a sound knowledge of available resources.
A diagnostic review was conducted:
- Survey of existing hydro-meteorological measuring network in the whole country
- Analysis of collected data (historical and current monitoring standards)
- Review of historical and existing institutional capacities and information paths
A clear concept for the rehabilitation and modernisation of Kyrgyzstan’s hydro-meteorological data collection system was prepared:
- Physical station rehabilitation and renewal of equipment
- Introduction of modern communication, telemetry and data processing systems
- Development of a hydrological forecasting system
- Comprehensive institutional strengthening and training programme