Subotica water upgrade project - PIU support, design, tendering and construction supervision

Standort

Serbia

Projektdauer

2013 - 2019

Leistungen

Project management;
Monitoring of the project implementation plan; Design review;
Preparation of tender documents;
Procurement support for 5 tenders in accordance with the EBRD Procurement Policies and Rules;
Perform the role of the FIDIC Engineer;
Construction supervision;
Capacity development

Subotica water upgrade project - PIU support, design, tendering and construction supervision
Subotica water upgrade project - PIU support, design, tendering and construction supervision
Subotica water upgrade project - PIU support, design, tendering and construction supervision
Subotica water upgrade project - PIU support, design, tendering and construction supervision
Subotica water upgrade project - PIU support, design, tendering and construction supervision
Subotica water upgrade project - PIU support, design, tendering and construction supervision
Subotica water upgrade project - PIU support, design, tendering and construction supervision
Subotica water upgrade project - PIU support, design, tendering and construction supervision

Project objectives
The overall objective is to facilitate the timely and effective implementation of the project by: 
(i) rendering assistance to the Company in implementation of the Project, including all aspects of design, procurement, construction supervision and contract administration; 
(ii) assisting directly in the design of technical and other documentation; 
(iii) performing the role of the FIDIC Engineer and the Technical Supervision (struèni nadzor).

Project description
The project is designed to address critical investment needs for water supply and wastewater infrastructure in Subotica.

Project data

Tender 1 (works tender): 10 km of sewer pipes (up to DN 1,600) and 3 km of water supply pipes (DN 100-300); Tender 2 (works tender): 6.4 km of water supply pipes (DN 80-300); Tender 3 (design, supply and install): new treatment plant and related infrastructure to be connected to the existing network; Tender 4 (works tender): construction of drilled wells; Tender 5 (works tender): construction of raw water collectors (6.000 m DN 180 – 500), optical cable system (8.430 m) and replacement of water main (66m DN 450-600).

Project specifics
The City intends to prevent further pollution of Paliã Lake by constructing adequate wastewater collection facilities in the settlements which currently still discharge untreated wastewater into the Paliã Lake.

Services
To assist Vodovod i Kanalisazija Subotica in all aspects of project implementation, including project management, design, procurement and construction supervision in accordance with the EBRD Procurement Policies and Rules and with FIDIC Contract conditions.